1. Zhang, H., Zhai, D. and Yang, Y. N.(2014) Simulation-Based Estimation of Environmental Pollutions from Construction Processes. Journal of Cleaner Production, 76:85-94.SCI
2. Zhang, H. (2013). Simulation-Based Estimation of Fuel Consumption and Emissions of Asphalt Paving Operations. Journal of Computing in Civil Engineering,10.1061/(ASCE)CP.1943-5487.0000326, 04014039. SCI,EI 4. Li, H and Zhang,H.*(2013)Ant colony Optimization-Based Multi-Mode Scheduling Under Renewable and Nonrenewable Resource Constraints. Automation in Construction. 35:431-438. SCI, EI
6. Zhang,H.,Xing,F.,Liu,J. (2011) Rehabilitation Decision-Making for Buildings in the Wenchuan Area. Construction Management and Economics. 29(6): 569-578. EI
7. Zhang,H., Xing,F. (2010) Fuzzy-Multi-Objective Particle Swarm Optimization for Time–Cost–Quality Tradeoff in Construction. Automation in Construction, 19:1067–1075. SCI,EI
8. Zhang,H., and Li,H. (2010) Multi-Objective Particle Swarm Optimization for Construction Time–Cost Tradeoff Problems. Construction Management and Economics. 28 (1), 75-88. EI
9. Zhang,H.(2008)Multi-Objective Simulation-Optimization for Earthmoving Operations. Automation in Construction, 18:79-85. SCI,EI
10. Zhang,H., Tam,C. M., Wang,J. Y. (2008)An Object-Oriented Approach for Modelling and Simulation of Construction Operations. International Journal of Simulation and Process Modelling, 4(1):31-42. EI
11. Zhang,H., Li,H., Lu,M. (2008)Modeling Time-Constrains in Construction Operations through Simulation. Journal of Construction Engineering and Management, ASCE, 134(7), 545-554. SCI,EI
12. Zhang, H., Wang, J. Y.(2008)Particle Swarm Optimization for Construction Site Unequal-Area Layout. Journal of Construction Engineering and Management, ASCE, 134(9):739-748. SCI,EI
13. Zhang, H., Tam, C. M., Li, H. and Shi, J., (2006) Particle Swarm Optimization-Supported Simulation for Constructions. Journal of Construction Engineering and Management, ASCE.132 (12), 1267-1274. SCI,EI
14. Zhang, H., Li, H. and Tam, C. M. (2006) Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. Journal of Construction Engineering and Management, ASCE. 132 (3), 259-267. SCI,EI
15. Zhang, H., Li, H. and Tam, C. M. (2006) Permutation-Based Particle Swarm Optimization for Resource-Constrained Project Scheduling. Journal of Computing in Civil Engineering, ASCE. 20 (2), 141-149. SCI,EI
16. Zhang, H., Li, H. and Tam, C. M. (2006) Heuristic Scheduling of Resource-Constrained, Multiple-Mode and Repetitive Projects. Construction Management and Economics. 24 (2), 159-169. EI
17. Zhang, H., Li, H. and Tam, C. M. (2006) Particle Swarm Optimization for Resource-Constrained Project Scheduling. International Journal of Project Management. 24(1), 83-92. SSCI,EI
18. Zhang, H., Tam, C. M. and Li, H. (2006) Multimode Project Scheduling Based on Particle Swarm Optimization. Computer-Aided Civil and Infrastructure Engineering. 21 (2), 93-103. SCI
19. Zhang, H. and Tam, C. M. (2005) Consideration of Break in Modeling of Construction Processes. Engineering Construction and Architectural Management. 12 (4), 373-390. EI
20. Zhang, H., Tam, C. M. and Li, H. (2005) Activity Object-Oriented Simulation Strategy for Modeling Construction Operations. Journal of Computing in Civil Engineering, ASCE. 19 (3), 313-322. SCI,EI
21. Zhang, H., Tam, C. M. and Li, H. (2005) Modeling Uncertain Activity Duration by Fuzzy Number and Discrete Event-Simulation. European Journal of Operational Research. 164 (3), 715-729. SCI,EI
22. Zhang, H. and Li, H. (2005) Particle Swarm Optimization-Based Schemes for Resource-Constrained Project Scheduling. Automation in Construction. 14(3), 393-404. SCI,EI
23. Shi, J., Li, H. and Zhang, H. (2005) Two Resource Dispatching Rules for Modeling Human Decisions in Simulation. International Journal of Project Management. 23, 97-107. EI
24. Zhang, H., Li, H. and Tam, C. M. (2004) Fuzzy Discrete-Event Simulation for Modeling Uncertain Activity Duration. Engineering Construction and Architectural Management. 11(6), 426-437. EI
25. Zhang, H. and Li, H. (2004) Simulation-based Optimization for Dynamic Resource Allocation. Automation in Construction. 13(3), 407-418. SCI,EI
26. Zhang, H. and Tam, C. M. (2004) Fuzzy Simulation of Flexible Construction Processes. International Journal of Computer Applications in Technology, 20(1/2/3), 15-25. EI
27. Zhang, H. and Tam, C. M. (2003) Object Oriented Approach in Construction Simulation. International Journal of Engineering Simulation, 4(1), 17-25.
28. Zhang, H. and Tam, C. M. (2003) Fuzzy Decision-Making for Dynamical Resource Allocation. Construction Management and Economics, 21(1), 31-41. EI
29. Zhang, H., Tam, C. M. and Shi, J. (2003) Application of Fuzzy Logic to Construction Simulation. Journal of Computing in Civil Engineering, ASCE, 17(1), 38-45. SCI,EI
30. Zhang, H. and Tam, C. M. and Shi, J. (2002) Simulation-Based Methodology for Project Scheduling. Construction Management and Economics, 20(8), 667-678. EI
31. Zhang, H., Shi, J. and Tam, C. M. (2002) Application of Simulation Related Techniques to Construction Operations. Engineering Construction and Architectural Management, 9(5/6), 433-445.
32. Zhang, H., Shi, J. and Tam, C. M. (2002) Iconic Animation for Activity-Based Construction Simulation. Journal of Computing in Civil Engineering, ASCE, 16(3), 157-164. SCI,EI
33. Zhang, H. and Tam, C. M. (2002) Fuzzy Decision Making for Resource Allocation Implemented by Simulation. International Journal of Engineering Simulation, 3 (1), 8-14.
34. Zhang, H., Shi, J. and Tam, C. M. (2002) Visual Modeling and Simulation for Construction Operation. Automation in Construction, 11(1), 47-57. SCI,EI
35. Zhang, H., Tam, C. M. and Shi, J. (2001) Resource Allocation Heuristic in Construction Simulation. Construction Management and Economics, 19(6), 643-651. EI
36. Zhang, H., Tam, C. M. and Shi, J. (2001) Activity Object-Oriented Simulation on a Visual Environment. International Journal of Computer Integrated Design and Construction, 3(2), 88-96.
37. Zhang, H., Tam, C. M. and Shi, J. (2000) Activity Object-Oriented Simulation Strategy for Construction Simulation. Proceedings of the Third European Conference on Product and Process Modeling in the Building and Related Industries. September 2000, 391-398. SCI
38. Zhang, H., Tam, C. M. and Shi, J. (2000) Easy-Use Animation for Activity-Based Construction Simulation. Proceedings of the IASTED International Conference on Modelling and Simulation. Pittsburgh, Pennsylvania, May 2000, 36-42.
39. Shi, J. and Zhang, H. (1999) Iconic Animation of Construction Simulation. Proceedings of the 1999 Winter Simulation Conference, December 1999, 992-997. EI